Summary: replacement connecting to the City's Southside Wastewater Treatment Plant. The existing 18-in line constructed in 1958 was replaced with 6787 L.F. of 24-in pipe and came on line January 2004.
Image Dimensions: 822 x 595
Image originally found here.