Summary: structural engineers. We also provided a full-time construction observation representative on site during the entire 11-month construction period.East Bay Sewer Pre-design, City of Olympia Roth Hill has been selected to prepare a pre-design report to assess the condition of an existing sewer system consisting of approximately 4,600 linear feet of 8-inch asbestos cement gravity
Image Dimensions: 225 x 168
Image originally found here.