Summary: of 54th Avenue. At the same time water and sewer services along 46th street were replaced with new services to the property line and the road base was reconstructed to a gravel standard. Engineering: The City of Camrose has selected Associated Engineering as the Design Engineer for this project, they will also be responsible for obtaining all the Associated Environmental
Image Dimensions: 552 x 450
Image originally found here.